Logging to file "DIAG-PTLOAD.log" ------------------------------- Loading Diagnostic Configurator ------------------------------- Configuring the simulation environment. Loading the diagnostic configurator from magnetic tape. Expect halt 102077 if successful. Programmed halt, T: 102077 (HLT 77), P: 77756 (ALF,ALF) Verifying DSN 000200. Configuring the diagnostic configurator for paper tape loading. Expect halt 106074 if successful. Programmed halt, T: 106074 (HLT 74), P: 77535 (JMP 77466) ----------------------------------------------- DSN (none) - 12875 Processor Interconnect Cable ----------------------------------------------- Loading the diagnostic. Expect halt 102077 if successful. Programmed halt, T: 102077 (HLT 77), P: 77237 (JMP 100) Configuring the diagnostic. Expect halt 107076 if successful. Programmed halt, T: 107076 (HLT 76,C), P: 00362 (LIA 1) Selecting the test set. Expect halt 107077 if successful. Programmed halt, T: 107077 (HLT 77,C), P: 00365 (LDB 230) Executing the diagnostic. Expect halt 102077 for successful completion. H14. START 12875 CABLE DIAGNOSTIC H77. END 12875 CABLE DIAGNOSTIC Programmed halt, T: 102077 (HLT 77), P: 00564 (JMP 365) sim> q Goodbye Log file closed